Our Eurocom system used the drop head operation in
order to maximise the resistance of props and beams H20.
Primary (main) beams are physically situated on drop
heads and secondary beams are leant on primary beams;
At the partial harderning of concrete, all the beams can
be removed, thanks to the rapid disarming system.
Props with fork heads and / or middle heads should be
positioned at the intermediate beam points and after the partial concrete hardening can be removed and used to build another floor.
This kind of system is useful especially for companies
that need to speed up the working process to build
floors and to reduce the material required for the
implementation, Moreover the accessibility of the mounting and use facilitates the arm operations giving benefits to the economy of building site.
Our connection system is really practical and very easy to use. It enables the implementation of stable shoring towers reducing the quantity of props involved in the setting in the building site.
The aim of our connecting frames is to balance the
longitudinal forces involved in the implementation of slabs.
Our system is designed to guarantee the operative flexibility as much as the safety of operators working on the building site.
Our framework can be used for the implementation of shoring towers with standard interaxle of 0.50-1.00-2.00 and 2.50 mt